The first week of my industrial training i learned about how to do the report for FLIR ASIA customer or client. As i said before, the main customer of FLIR ASIA is TENAGA NASIONAL BERHAD. After the teams did the infrared and ultrasonic inspection to detect problems, they need to proceed by process the the infrared picture and ultrasound graph which are:

1. FORMATTING REPORT
2. ANALYSIS PROBLEMS
3. FINAL REPORT
The FLIR ASIA teams usually do the inspection at 3 main places:
1. Pencawang Elektrik,PE
2. Pencawang Masuk Utama, PMU
3. Pencawang Pembahagi Utama,PPU
In the report that i've done in the 1st week, all of it are the report regarding inspection of Pencawang Elektrik,PE. In the PE i can saw there are 3 main equipment which are LV Board, Transformer and Switchgear.

Pencawang Elektrik,PE



LV Board



Transformer (11kV~415V)

Switchgear