Day 16 (26th April 2010)
v As usually, my routine is to do the report formatting. To day I need to formatting for:
Client: TNB Distribution KL Pusat
Date of Inspection: 22th April 2010
No. of Reports: 13 (for each substation)
1. PE 11kV/415V Merdeka Villa Blok 1B Jln Merdeka
2. PE 11kV/415V Merdeka Villa Blok 2C Jln Merdeka
3. PE 11kV/415V Merdeka Villa Blok 3 Jln Merdeka
4. PE 11kV/415V Industri Ringan Jln Merdeka No. 1
5. PE 11kV/415V Avenue Ampang 2 Jln Ikan Emas
6. PE 11kV/415V No 2 Rumah Pangsa Kos Rendah
7. PE 11kV/415V No 3 Rumah Pangsa Kos Rendah
8. PE 11kV/415V DCasa Condo Bandar Baru Ampang
9. PE 11kV/415V Bandar Baru Ampang No. 1
10. PE 11kV/415V Avenue Ampang 1 Jln Ikan Emas
11. PE 11kV/415V Apartment Mesra Villa Jln Ikan Emas
12. PE 11kV/415V Rumah Pangsa Mesra Prima Jln Ikan Emas
13. PE 11kV/415V Rumah Pangsa Blok A Kelompok Camar
Client: TNB Distribution Kuala Lumpur
Date of Inspection: 22th April 2010
No. of Reports: 13 (for each substation)
1. PMU 132kV/33kV Golloway
2. PPU 33kV/11kV Bukit Bintang
3. PPU 33kV/11kV Starhill
v I read about Standard Operation Procedure (SOP) of Flir Asia Sdn Bhd. From here I can imagine how the teams do their work every day at TNB’s substations.
v Chapter 1: Job initiation
· The Scanning Job is initiated when a purchased ordered (PO) is received from the client.
· Every purchased order(PO) must clearly state the following basic information:
i. The PO reference number.
ii. The date of PO is issued.
iii. The territory to be scanned.
iv. The Value of the Job.
v. The name of officer in charge, representing the client.
v Report formatting for TNB Distribution (Shah Alam) and TNB Distribution Kuala Lumpur.
v Read Standard Operation Procedure (SOP)
v Chapter 2: Scanning Operation (General Work)
v Discussed about general scope of work besides infrared and ultrasonic scanning.
v Safety Gears: Safety gears is required to enter substation, to prevent an accident during scanning operation are:
i. Safety shoes
ii. Safety google
iii. Safety helmet
iv. Safety jacket/overall
Day 18 (28th April 2010)
v Go to the site with one of the team for scanning.
v To day is my first time experience work with one of the team of Flir Asia Sdn Bhd.
v Learn and see how the technician uses the Vario Scan Camera.
v Ring Main Unit (RMU) : type of switchgear – SF6 Gas Breaker.
Day 19 and 20 (29th and 30th April 2010)
v For these two days I need to complete the report formatting.
v After one month does my internship here, I just do report formatting for the company. From the report formatting I learn and see many types and brand of switchgear.
v Know how to differentiate from the infrared picture whether there are problem occur at the compartment/equipment.
No comments: