Client: TNB Distribution (Shah Alam)
Team Leader: Mr. Rehan Fairuz
Inspection Date: 29th April 2010
No. of report/substation: 10
1. PE 11kV Racing Circuit
2. PE 11kV/415V Nishio
3. PE 11kV/415V Bright Packaging
4. PE 11kV/415V Fens Brothers
5. PE 11kV/415V MAA Subang Hi-Tech
6. PE 11kV/415V Global Chem
7. PE 11kV/415V Linberg
8. PE 11kV/415V Wisscomm
9. PE 11kV/415V Arbtrade
10. PE 11kV/415V Federal Highway No. 3
Client: TNB Distribution (Kuala Lumpur)
Team Leader: Mr. Mohd Zakri
Inspection Date: 30th April 2010
No. of report/substation: 3
1. PPU 33kV/11kV Cycle Carrie
2. PPU 33kV/11kV Daya Bumi
3. SSU 33kV Smart
In the evening, the engineer of Flir Asia, Mr Rehanfairuz explained to me about the TNB Distribution systems. The Substation of TNB contains of:
From Power Station (Generation)~
- Pencawang Masuk Utama,PMU (500kV/350kV/275kV/132kV/33kV/11kV)
- Pencawang Pembahagi Utama, PPU (33KV/11kV)
- Stesen Suiz Utama, SSU (33kV)
- Pencawang Elektrik, PE (11kV/415V)
- Pencawang Elektrik, PE (11kV)
- Stesen Suiz Utama, SSU (11kV/415V)
- Stesen Suiz Utama, SSU (11kV)
- Stesen Suiz, SS (11kV)