MDiYaNa's INTERNSHIP
Work Hard to Learn Much
Saturday, May 22, 2010
Week 7 (17th ~21st May 2010)
Friday, May 14, 2010
Tuesday, May 4, 2010
Types of Switchgear
- Vacuum Circuit Breaker
- Oil Link Unit
- SF6 Gas Breaker
Monday, May 3, 2010
Week 5 ~ Day 21 (3rd May 2010)
- Pencawang Masuk Utama,PMU (500kV/350kV/275kV/132kV/33kV/11kV)
- Pencawang Pembahagi Utama, PPU (33KV/11kV)
- Stesen Suiz Utama, SSU (33kV)
- Pencawang Elektrik, PE (11kV/415V)
- Pencawang Elektrik, PE (11kV)
- Stesen Suiz Utama, SSU (11kV/415V)
- Stesen Suiz Utama, SSU (11kV)
- Stesen Suiz, SS (11kV)
Friday, April 30, 2010
WeeK 4 (26th~30th April 2010)
Day 16 (26th April 2010)
v As usually, my routine is to do the report formatting. To day I need to formatting for:
Client: TNB Distribution KL Pusat
Date of Inspection: 22th April 2010
No. of Reports: 13 (for each substation)
1. PE 11kV/415V Merdeka Villa Blok 1B Jln Merdeka
2. PE 11kV/415V Merdeka Villa Blok 2C Jln Merdeka
3. PE 11kV/415V Merdeka Villa Blok 3 Jln Merdeka
4. PE 11kV/415V Industri Ringan Jln Merdeka No. 1
5. PE 11kV/415V Avenue Ampang 2 Jln Ikan Emas
6. PE 11kV/415V No 2 Rumah Pangsa Kos Rendah
7. PE 11kV/415V No 3 Rumah Pangsa Kos Rendah
8. PE 11kV/415V DCasa Condo Bandar Baru Ampang
9. PE 11kV/415V Bandar Baru Ampang No. 1
10. PE 11kV/415V Avenue Ampang 1 Jln Ikan Emas
11. PE 11kV/415V Apartment Mesra Villa Jln Ikan Emas
12. PE 11kV/415V Rumah Pangsa Mesra Prima Jln Ikan Emas
13. PE 11kV/415V Rumah Pangsa Blok A Kelompok Camar
Client: TNB Distribution Kuala Lumpur
Date of Inspection: 22th April 2010
No. of Reports: 13 (for each substation)
1. PMU 132kV/33kV Golloway
2. PPU 33kV/11kV Bukit Bintang
3. PPU 33kV/11kV Starhill
v I read about Standard Operation Procedure (SOP) of Flir Asia Sdn Bhd. From here I can imagine how the teams do their work every day at TNB’s substations.
v Chapter 1: Job initiation
· The Scanning Job is initiated when a purchased ordered (PO) is received from the client.
· Every purchased order(PO) must clearly state the following basic information:
i. The PO reference number.
ii. The date of PO is issued.
iii. The territory to be scanned.
iv. The Value of the Job.
v. The name of officer in charge, representing the client.
v Report formatting for TNB Distribution (Shah Alam) and TNB Distribution Kuala Lumpur.
v Read Standard Operation Procedure (SOP)
v Chapter 2: Scanning Operation (General Work)
v Discussed about general scope of work besides infrared and ultrasonic scanning.
v Safety Gears: Safety gears is required to enter substation, to prevent an accident during scanning operation are:
i. Safety shoes
ii. Safety google
iii. Safety helmet
iv. Safety jacket/overall
Day 18 (28th April 2010)
v Go to the site with one of the team for scanning.
v To day is my first time experience work with one of the team of Flir Asia Sdn Bhd.
v Learn and see how the technician uses the Vario Scan Camera.
v Ring Main Unit (RMU) : type of switchgear – SF6 Gas Breaker.
Day 19 and 20 (29th and 30th April 2010)
v For these two days I need to complete the report formatting.
v After one month does my internship here, I just do report formatting for the company. From the report formatting I learn and see many types and brand of switchgear.
v Know how to differentiate from the infrared picture whether there are problem occur at the compartment/equipment.
Friday, April 23, 2010
WeeK 3 (19th~23rd April 2010)
Friday, April 16, 2010
WeeK 2 (12th~16th April 2010)
- Download Infrared pictures, Photos and Ultrasonic graph from flirimage server for report formatting.
- I need to do report formatting for Mr.Rehanfairuz (Team Leader) team.
- From last week assignment, my supervisor (Mr.Khairil Fitri) recommend me to read Bangkok Conference Slides. It is easy for me to be at the site after i understand what actually the company do.
- After finished my work, i have some extra time to read the slide.
BANGKOK CONFERENCE SLIDE
There are 8 topics discussed in this slide which are:
- Utility's target - Zero Downtime
- Preventive Maintenance as the least -cost approach towards Zero Downtime.
- Condition Monitoring as an important input in Preventive Maintenance Program.
- The Role of Infrared Scanning in Condition Monitoring and the Speacial Capability of Thermoflir Infrared Camera.
- Case Study Demonstration effectiveness of its high technology in Condition Monitoring.
- Technology, Procedure and Responsibility.
- Actual Data.
- Complimentary System (Digital Ultrasonic Scanner).
- For the extra time, I finished read the first 3 topics.
1.Utility's Target
As we all know, electricity is a basic necessity in our daily life. So, we know the main supplier of electricity in our country is Tenaga Nasional Berhad, TNB have to make sure consumer get this basic necessity in every hours.
- Target - Zero Downtime: Continuous supply of electricity is paramount to highly critical installation. Thus, 'Zero Downtime' is primary target.
2.Preventive Maintenance
"Prevent is the better way before the Flash Over Occur"
- Is the least-cost approach towards zero downtime.
3.Condition Maintenance
There are 3 types of condition maintenance which are:
i. Breakdown Maintenance, BM; is maintenance that is undertaken after a component fails.
ii. Scheduled Maintenance, SM; is where a ficility is taken offlne at fixed interval and scheduled maintenance is performed.
iii. Preventive Maintenance, PM; allows the early detection of potential equipment failure. This is also one of the maintenance that prefered by TNB due to least-cost approach.
Condition Monitoring System
- Before the problem or accident happen (i.e Flash Over), the best way (least-cost approach) is to monitor the condition of the substation.
- The condition of substation can be monitor using Infrared technology.
- Infrared technology:
- Service provider could asses teh condition of the electrical power equipment under 'live condition'.
-This is very important as the infrared scanning operation wil not disrupt the present supply of electricity to the respective clients.
Day 8 (13th April 2010)
- Download Infrared pictures, Photos and Ultrasonic graph from flirimage server for reports formatting.
- I need to do report formatting for:
Client: TNB Distribution KL Pusat
Date of Inspection: 12th April 2010
No. of Reports: 8
- Studied Bangkok Conference Slide
4.The Role of Infrared Scanning in Monitoring Condition and Speacial capability of thermoflir Infrared Camera.
The Basic Principle
- Each object has its own 'heat capability'.
- When the object is worm/hot, it produces radiation.
- The radiation can be quantified in term of frequency.
- The object is hotter ~ the higher the radiation~the higher the frequency intensity.
- This frequency - detected by infrared sensor and sends the data over the infrared system processor.
- The infrared system processor will subsequently process the data and projecting an infrared image on the screen.
Tuesday, April 13, 2010
1st day 2nd week
8.30am : My supervisor arrived and there are some proplem regrading then internet connection. I cannot start my daily routine which is report formatting because the system down.
8.45am : My supervisor try to fix the connection while i'm write my Industrial Training Diary (Logbook) for last week activities.
9.00am : they said that new infrared camera will sent by the seller today.
9.30am : Start report formating.
12.30pm : My supervisor ask me to print a bundle of report which is 28 March ~2 april 2010 inspection's reports.
1pm : Lunch with kak Shida and Iera at the garden. I eat korean food...yummy nice. Guess how much i spend for that korean ffod at The Garden?? Rm12.oo+ Soya drink RM3.15 (including tax). If every day i spend this amount of money for lucnh, POKAI oooooo....
2.15pm : done print the reports, continue report formatting untul 5pm. DONE!!
Sunday, April 11, 2010
1st Week of My Internship: FORMATTING
2. Pencawang Masuk Utama, PMU
3. Pencawang Pembahagi Utama,PPU
Pencawang Elektrik,PE
LV Board
Transformer (11kV~415V)
Switchgear
Thursday, April 8, 2010
Introduction...
Here are the picture of equipment that they use to detect the problems using infrared & ultrasonic techniques:
Tuesday, April 6, 2010
My First Day INteRnsHip
Wednesday, March 24, 2010
OFFER LETTER
I got industrial training placement at FLIR ASIA SDN. BHD. Before i get the offer, there is an interview conduct by Mr Khairil which is the Senior Manager(Project) of the company. I was nervous while waiting for the results of the interview. But lastly i got the placement. Excited & happy. :))
Truly,
MUAZ DIYANA